THE ION STICK Alternative Environmental Water Treatment

 

 

Home Company Applications Process Case Studies FAQ's Site Map

PROBLEM:

Waterside deposition and microbiological slime build-up

SOLUTION:

Sidestream filtration in conjunction with our non-chemical electrostatic water treatment product, the ION STICK

Before ION STICK Installation
4 inch pipe
After ION STICK Installation
3 Months!

 

APPARATUS:

On existing sidestream systems, retrofit the ION STICK on return line and reduce dependency on expensive chemical treatment. Full turnkey skid mounted units are available.

 

OPTIONAL FILTRATION:

Suspended solids control is essential to ensure performance against scaling and deposition. Those systems that accumulate high volumes of suspended solids should employ suitable filtration. Guidelines for filtration are as follows:


OPEN RECIRCULATING SYSTEMS (i.e.: Cooling Towers):


CLOSED RECIRCULATING SYSTEMS:

TESTING AND MONITORING:


SYSTEMS:

• Domestic Hot Water
• Open recirculating
• Closed Loop Heating
• Wash Humidification


Home | Company | Applications | Process | Case Studies | FAQ's | Site Map