| THE ION STICK Alternative Environmental Water Treatment |
| Home | Company | Applications | Process | Case Studies | FAQ's | Site Map |
Cooling Towers, Chillers, Condensers
TECHNICAL (SYSTEM) INFORMATION: Within the research facility of a large company in Ontario, the air conditionaing operation experiensed some unsuspected waterside problems.
In the spring and fall months when the airconditioning demand was tempermental, river water was pumped once through the chilled water piping system. This system included seven coils which supplied different areas of the building.
When the outside temperature was consistently high enough, and the river water temperature was excessive, the Carrire Delta T centrifugal water loop was closed and the system operated in the conventional manner.
PROBLEMS: The chilled water piping after 17 years with very little or no treatment deposition had reduced the piping diameter in places from 4" to 1". The decreased flow caused the system to become ineffective and heat transfer was minimal.
SOLUTIONS AVAILABLE:
| Chemical Cleaning: | Cost in excess of $20,000.00 |
| Physical Removal: | Rejected due to mess |
| Replacement: | Cost in excess of $100,000.00 |
| ION STICK : | $3,400.00 cost + labour which can be carried out by present staff |
PROCEDURES: Although
dubious, it was decided to try the ION STICK since it was the least costly
solution and with time over the Winter season the following procedure was
followed:
RESULTS:
![]() |
![]() |
|
Before ION STICK |
After ION STICK |
As of March, 1988 the section of pipe being monitored had been opened up to almost its full diameter with only spotted sections of scale and over 90% of the sludge and scale removed. Replacement of the piping was not necessary. Efficiency and operation improved dramatically.
Home | Company | Applications | Process | Case Studies | FAQ's | Site Map